Respected Sir,

I am a Fresh graduate, residing in Jeeva nagar 2nd street, Madurai - 625011, which comes under madurai corporation. the underground drainage works have been completed and the works for the rain water drainage is going on. The JCB is been used to dig holes there. Those JCB,s they are plucking the drainage pipes from each home which were fixed already. We were informed that those pipes fixing will be done by the corporation itself. But now they are not considering damaged pipes. All peoples are installing the pipes at their own cost for the second time.

And there is a tree near by the home for which the rain water drainage has but curved off to the centre of the small road. so it would reduce the size of the road. Already its a small and densely populated area, always facing the problem of traffic. That drainage is 1 FEET tall and imaging if it comes in the center of the road. As am an Engineer I have the basic idea of those works. And no Engineer will recommend those ideas of building the drainage which stands 1FEET Tall in the center of the road.

kindly take immediate action as the work is going on in that places